| | |
CAB Redesign |
|
High
trejus22 2006-04-26 13:19
DESIGN FEATURES: Plan C Plan C incorporates all the features from plans A and B, but does so in a fashion that meets all the square footage requests of current users by adding 14,500 sq ft of new space. It also incorporates additional lounge space facing the forest to the North and extends dining services and an outdoor dining area towards Red Square. With the bridge removed this option creates a new welcoming back door for access from housing and the Campus Recreation Center. Additionally this plan creates a dramatic and light filled atrium that makes the sustainability of the building visible and a north-side landscaped rainwater stream that brings the forest to the building. How GREEN is Plan C? Plan C will incorporate Gold standards in sustainable building. The design brings rainwater from the roof through the building, captures it, and uses it to reduce domestic water consumption and provide irrigation to outside gardens. An atrium water feature will make the rainwater re-use system visible. Plan C also incorporates other green features such as edible landscaping, solar hot water and natural ventilation. A photovoltaic solar demonstration project will be proposed. LEED Gold certified How MUCH will this COST? Total Project Cost $20,970,000 Requested State Funding $ (4,900,000) Student Contribution $16,070,000 Student Fee $5.75 per credit 16 credits x 3 quarters x $5.75 = $276.00 annually (see attachment below for final design of Plan C)
|
| this is a footer |