| | |
CAB Redesign |
|
Medium
trejus22 2006-04-26 13:18
DESIGN FEATURES: Plan B In addition to what is described in Plan A, Plan B adds 7,800 sq. ft of new space. This plan provides more student organization space, additional lounge areas, a dedicated student performance space, an art gallery and an expansion of the dining area. In this plan an open atrium is created to all three floors. A new face for the building is constructed by creating an expansive glass frontage and an outdoor dining area on Red Square. The bridge connecting the Campus Recreation Center is removed to create a new outdoor performance space and a visual link to the forest. How GREEN is Plan B? Plan B will focus on some sustainable water and energyefficiency strategies. It will provide some natural ventilation and also include sustainable and healthy materials. A photovoltaic solar demonstration project will be proposed. LEED Silver certified How MUCH will this COST? Total Project Cost $16,899,000 Requested State Funding $ (4,900,000) Student Contribution $11,999,000 Student Fee $4.25 per credit 16 credits x 3 quarters x $4.25 = $204.00 annually (see attachment below for final design of Plan B)
|
| this is a footer |